Project Overview

Item Details
Client Kh C T******* Co.
Country Morocco
Industry Cement Packaging
Product PP Woven Block-Bottom Valve Bags, 25–50kg
Annual Capacity 60 Million Bags/Year
Daily Capacity 200,000 Bags/Day

Morocco Cement Bag Plant

Client Challenges

The Moroccan client was building a cement bag plant from scratch and faced several critical challenges before production.

Multi-Supplier Complexity

A complete PP woven bag production line requires equipment from multiple specialized manufacturers. Coordinating specifications, delivery schedules, and system compatibility across different suppliers created significant project management challenges.

Morocco Cement Bag Plant

No Local Production Experience

The local workforce had no previous experience in PP woven bag manufacturing. The customer needed a partner who could provide complete technical support, operator training, and production guidance — not just equipment supply.

Capability Verification

Before committing to the project, the customer needed reliable proof of technical expertise, equipment quality, and long-term after-sales support.

Morocco Cement Bag Plant

Strict Production Deadline

The customer had signed supply contracts with cement producers and required the factory to start production within 4 months, including equipment shipment and installation in Morocco.

Our Solution

HAOSEN provided a complete turnkey solution and took responsibility for the entire project lifecycle — from production line configuration and workshop planning to installation, commissioning, and operator training.

Morocco Cement Bag Plant

Equipment Configuration

Equipment Quantity
High-Speed Flat Wire Extrusion Line 2 Sets
High-Speed Circular Looms 90 Sets
Double-Side Lamination Machine 1 Set
8-Color CI Flexo Printing Machine 1 Set
Slitting Machine 1 Set
Block-Bottom Valve Bag Making Machine 2 Sets

 

Morocco Cement Bag Plant

Service Scope

  • Complete production line integration with synchronized speed and tension control.

  • Full workshop electrical design, including power distribution and machine control systems.

  • AI visual inspection system for printing and bag-making processes.

  • On-site installation, commissioning, and operator training by HAOSEN engineers.

  • 24/7 PLC-connected remote monitoring and technical diagnostics after project handover.

  • Morocco Cement Bag Plant

Key Results

Metric Result
Time to Production 4 Months
Daily Capacity 200,000 Bags
Annual Capacity 60 Million Bags
Scrap Rate Below 0.1%
Operator Training 2 Weeks
Customer Expansion Second Production Line Ordered

Process Showcase

  • Equipment installation: extrusion line and 90-loom production array.

  • Training sessions with HAOSEN engineers and local operators.

  • Production launch with finished cement bags coming off the production line.

Client Testimonial

"HAOSEN delivered the complete line on schedule and trained our team to run it independently in just two weeks. The AI inspection system keeps our scrap rate negligible. What impressed us most was having one partner accountable for everything — no finger-pointing between suppliers."

— A******* T***-F****, Procurement Manager, Morocco

Start Your PP Woven Bag Project

Tell us your machine model, target capacity, bag type, factory layout, or delivery plan. Our team will respond with practical turnkey suggestions and line configurations.
Headquarters (HQ)

7500A Beach Road, #04-307, The Plaza, Singapore 199591

Send Your Inquiry

Share a few details and we will get back to you with clear next steps.

Inquiry Drawer

Review & Submit Request

This site uses cookies

We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.more details